İstanbul New Airport WWTP
Treatment process selected for the plant as follows; physical treatment, biological treatment, sludge thickening and dewatering, solar sludge drying system and water recovery system. Sludge originating from the plant will be dried via solar drying halls and then sent to the final disposal. Water that will be used for cooling towers and irrigation system will be generated by water recovery system in order to achieve advance treatment for cooling towers, the treated water passed by sand filters and ultrafiltration membranes. The plant will be operate for 5 years following the construction works under this contract.
Plant Capacity : 15.000 m3/day