Makina İhtisas OIZ WWTP
Contract of the construction of 2000 m3/day industrial and domestic wastewater treatment plant and operation of of the plant for 36 months has signedon 01.08.2016 at the Organized Industrial Zone General Directorate
Wastewater treatment plant has designed to have elasticity to adapt different scenerios for flows and organic loads.